Keith Ladzinskiのインスタグラム(ladzinski) - 7月16日 22時56分
A crane driven elevator being lowered some 200 feet under ground into Chicago’s Tunnel And Reservoir Project (TARP). This series of tunnels is designed to contain storm water, flood water and sewage from entering into Lake Michigan and is capable of holding 8 billion gallons where it can then be treated. The 40 year project is a remarkable feet of engineering and is still underway with continued expansion. / Photographed for @ナショナルジオグラフィック
[BIHAKUEN]UVシールド(UVShield)
>> 飲む日焼け止め!「UVシールド」を購入する
11,777
87
2020/7/16
Aria Alexanderさんがフォロー